CIRCUIT v1.1.0 · Assessment Tool

CIRCUIT Assessment

Compute your Circuit Risk Score, evaluate CIRCUIT Hard Rule compliance, and generate a registry-ready YAML entry. Choose the path that fits your goal.

5 minutes

Quick Look

Enter five parameters and get your Circuit Risk Score, band, IMS ceiling and floor status, and Rule 9 check instantly. No account, no save, no export. Ideal for a first read on a system or a sensitivity check before a full assessment.

  • Category, Tier, IMS, DCW → CRS and band
  • IMS ceiling per category
  • IMS floor warning per tier
  • Rule 9 categorical check
  • IMS sensitivity preview
Start Quick Look →
30–60 minutes

Standard Assessment

Complete the full 8-section registry entry — identity, maturity, circuit inventory, KPI baseline, 29-question vendor transparency questionnaire, red team record, compensating controls, and lifecycle. Draft auto-saves in your browser; export valid Schema A YAML at any step.

  • All 8 Schema A sections
  • 29-question vendor questionnaire (A–D)
  • Live CRS and rule violation panel
  • Draft auto-saved in browser (no account)
  • YAML export throughout
Start Assessment →
2 minutes

YAML Upload

Upload or paste an existing registry entry in YAML format. CIRCUIT validates the schema, computes CRS, checks all ten Hard Rules, and renders a compliance summary. Optionally continue editing in the Standard Assessment form.

  • Drag-drop or paste YAML
  • Field-level schema validation
  • CRS and band computation
  • All-rules compliance check
  • Export to Standard Assessment
Upload YAML →

Framework Quick Reference

CRS Formula

Risk Tier × (6 − IMS) × DCW
Max under linear scale: 4×6×5 = 120

B1 Band Thresholds

Green 1–12  ·  Amber 13–47
Red 48–96  ·  Purple 97–120

IMS Ceilings

Category A (open weights): IMS 5
Category B (API): IMS 3
Category C (embedded): IMS 2

IMS Floors

Low tier: IMS 1  ·  Moderate: IMS 2
High: IMS 3  ·  Critical: IMS 3

Rule 9

Category C cannot host High/Critical-tier workflows with DCW ≥ Irreversible (4). Blocks deployment.

Rule 8 (60-Day Window)

Vendor non-response >60 days + ≥2 outreach attempts: CRS uses IMS 0 until response received.

CIRCUIT Framework v1.1.0  ·  This tool runs entirely in your browser — no data is sent to any server.